PERI GmbH, Formwork Scaffolding Engineering
 
Construction site of the month

Seewinkeltherme, Frauenkirchen
Austria
With PERI system equipment the concrete shell of the spiral-shaped Seewinkel thermal baths complex can be completely finished in only nine months. In the area of the building core, PERI UP modular scaffold forms an appropriate load-bearing system for construction of the up to seven-metre high wall sections at heights of ten to sixteen metres.