Pars Multi Purpose Trade-Administrative Complex Project, Tehran, Iran
Efficient solutions with cost-effective system combination for walls, columns and slabs
This huge project has all the capabilities required to become an economic, administrative-trade center in Tehran. The TRIO system is being used to construct the walls and columns of this project. VARIO form has been used as the frontal form to distribute the fresh concrete force at the end of the wall. With repetitive floor plan, the PERI table form was chosen as the most cost-effective solution for the slabs.
The crew can work very quickly with TRIO because it has few different components. Together with PERI, it was possible for us to maintain the schedule for this important project.