Multi-Storey Buildings

Potowatomi Bingo Casino Expansion Project, Milwaukee, Wisconsin Work began in December 2006 on the $240 million expansion to the Potowatomi Casino in downtown Milwaukee. Using SKYDECK, the contractor broke the floorplan of 130,000 ft² (12,000 m²) into ten approximately equal pours.
Children‘s Hospital, Milwaukee, Wisconsin Construction of the five concrete core and shear walls for the 14 story expansion to the Milwaukee Children’s Hospital was accomplished using TRIO panelized wall formwork and KGF climbing units.
European Patent Office, Munich, Germany Located in the Munich city centre, the European Patent Office was extended through the addition of two building complexes. The two buildings were constructed in an offset position to each other over a length of nearly 200 m and featured modern ...
Galileo Satellite Control Centre, Oberpfaffenhofen, Germany The control centre of the European satellite navigation system, Galileo, which is currently under construction has a range of both technical and optical special features. Then this extraordinary architectural concrete structure includes three ...
Toulouse-Blagnac Airport, France The project is being developed by a consortium which is comprised of three French construction companies, with formwork know-how and efficient system equipment being supplied by the formwork and scaffolding specialist, PERI.